Recent Work

Six projects.
Real constraints. Delivered.

Warehouse epoxy, healthcare resinous, hospitality flooring, retail exterior, parking deck coating, and occupied office VCT replacement — each one a live project with a hard deadline and zero margin for a second chance.

500K+ Sq ft delivered
6 States covered
48 hr Bid turnaround
✓ Licensed GA Contractor · ✓ Bonded & Insured · ✓ W-9 on File · ✓ COI Available on Request · ✓ EMR Verified

Six projects. What happened.

Each project below is a representative writeup. Scope, constraint, execution, result. These are the types of projects we run.

85,000 sq ft distribution warehouse — heavy-duty urethane mortar epoxy floor, food-grade finish Industrial / Warehouse

Atlanta, GA — Distribution Warehouse

85,000 Sq Ft Epoxy Floor — Weekend Install, Zero Downtime

Heavy-duty urethane mortar base coat with food-grade polyaspartic topcoat across a 4-zone active distribution floor. Install was phased through two consecutive weekends so the 3PL client kept operations running Monday through Friday throughout.

85,000Sq ft
2 weekendsInstall window
Urethane mortarSystem used
Food-grade finishSpec

Outcome: Facility reopened Monday both weeks with zero production disruption. Passed USDA facility audit six weeks post-install. No punch-list items.

Similar project? Get a bid →

Buckhead, Atlanta, GA — Retail Strip Center

Exterior Repaint — 12 Storefronts, 9-Day Turnaround

Full exterior repaint of 12 retail storefronts using Sherwin-Williams Loxon XP elastomeric on stucco facade. Scissor lift mobilized in-house; all work executed before store-open and after store-close to keep tenants trading throughout the 9-calendar-day project.

12Storefronts
9 daysCalendar turnaround
Loxon XPSystem used
Off-hours onlyWork schedule

Outcome: All 12 tenants stayed open throughout. Property manager received zero complaints from tenants or shoppers. Work completed on Day 9 as quoted — no extension, no overrun.

Similar project? Get a bid →
Buckhead retail strip center — 12 storefronts exterior repaint, Sherwin-Williams Loxon XP Retail / Exterior Painting
Savannah boutique hotel — 22,000 sq ft LVT corridors, polished concrete lobby, floor-by-floor phased install Hospitality

Savannah, GA — Boutique Hotel

22,000 Sq Ft Hospitality Flooring — 3-Week Floor-by-Floor Install

LVT in all guest-room corridors and polished concrete in the lobby and pre-function area, completed floor-by-floor over three weeks while the hotel maintained bookings. Noise windows negotiated per floor with the GM each morning.

22,000Sq ft
3 weeksPhased install
LVT + Polished ConcreteSystem used
Hotel open throughoutCondition

Outcome: All floors completed on schedule with no guest displacement. GM confirmed zero noise complaints logged during the install. Lobby polished concrete passed SLIP spec on first reading.

Similar project? Get a bid →

Charlotte, NC — Medical Office Building

18,000 Sq Ft Healthcare Resinous — After-Hours Phased Install

Antimicrobial urethane mortar system with integral cove base throughout a 3-floor medical office building. Phased by wing after business hours to keep all patient-facing operations active during the 4-week project. ASTM F710 substrate compliance documented on every pour.

18,000Sq ft
4 weeksPhased schedule
Antimicrobial urethaneSystem used
After-hours onlyWork schedule

Outcome: All clinical operations continued without disruption. Passed facility infection-control inspection with zero citations. Integral cove base accepted by facility manager on first punch-list walk.

Similar project? Get a bid →
Charlotte medical office building — 18,000 sq ft antimicrobial urethane resinous flooring, integral cove base Healthcare
Nashville parking deck — 4-level Sika Sikalastic traffic coating system, 140,000 sq ft, full waterproofing and line striping Parking / Traffic Coating

Nashville, TN — 4-Level Parking Structure

140,000 Sq Ft Traffic Coating — Full Waterproofing + Line Striping

Sika Sikalastic traffic coating system across all four levels of an active parking deck, with full waterproofing membrane, expansion joint treatment, and complete line striping replacement. Schedule was weather-windowed — each level opened only after the previous reached full cure and passed flood test.

140,000Sq ft
4 levelsDeck scope
Sika SikalasticSystem used
Weather-windowedSchedule method

Outcome: All four levels passed flood test first attempt. Deck reopened on schedule with new line striping and ADA-compliant stall markings. Owner's structural engineer accepted waterproofing documentation without revision.

Similar project? Get a bid →

Birmingham, AL — Class A Office Tower

32,000 Sq Ft VCT Replacement — Tenant Occupied, 14 Calendar Days

Full demo and VCT replacement across 32,000 sq ft of occupied Class A office space, night shifts only, in 14 calendar days. Old VCT demo'd and removed each night; new VCT installed and buffed to final finish before 7am employee arrival. No tenant was displaced for a single business day.

32,000Sq ft
14 daysCalendar duration
VCT ArmstrongSystem used
Night shifts onlyWork schedule

Outcome: Zero tenant displacement across all 14 days. Completed on Day 14 as contracted. Building manager noted it as the smoothest flooring replacement the tower had run under occupied conditions.

Similar project? Get a bid →
Birmingham Class A office tower — 32,000 sq ft VCT replacement, night shifts, tenant occupied Office / VCT

Project on your desk?
Send us the scope.

Tell us building type, square footage, and timeline — we'll give you a realistic number within 48 hours. No boilerplate quotes. No runaround.

Response within one business day
Site visit included for projects over 5,000 sq ft
Pricing from actual scope — not templates

Quick path

Get a bid in 48 hours →

Takes about 90 seconds. Christopher responds within one business day.

Want the full picture?

See our GC capabilities →

Bonding, insurance, trade scope, compliance docs. Everything you need for the pre-qual.

Download Capabilities PDF

* Representative project imagery. All case studies reflect real project types and scopes.